Risk Identification and Project Performance in Libyan Construction Companies: Empirical Evidence from 240 Professionals
- Authors
-
-
Abdulnasir Abdulrraziq Mohammed Akhrees
Faculty of Arts and Architecture, University of Derna, Derna, Libya.Author -
Saaed Awad Abrabba Saaed
Faculty of Engineering Technologies, University of Derna, Al-Qubba, LibyaAuthor -
Abdulbasit Abdulrhman Abdulraziq Abdulsamea
Faculty of Engineering Technologies, University of Derna, Al-Qubba, LibyaAuthor -
Fathi Alnagi Akreem Mahmoud
Faculty of Engineering Technologies, University of Derna, Al-Qubba, LibyaAuthor
-
- Keywords:
- Risk identification; Project performance; Construction industry; Libya; Risk management
- Abstract
-
This study examines whether systematic risk identification is associated with project performance in Libyan construction companies. A quantitative, cross-sectional survey was administered to 240 construction professionals selected through convenience sampling. Risk identification and project performance were measured using structured five-point Likert-scale items. Instrument reliability was acceptable for risk identification (Cronbach's alpha = 0.734) and strong for project performance (alpha = 0.888), while the full 27-item instrument reported alpha = 0.969. Pearson correlation and simple linear regression were used to test the proposed relationship. Risk identification was positively and significantly correlated with project performance (r = 0.352, p < 0.001). The regression model was statistically significant, F(1, 238) = 33.711, p < 0.001, and explained 12.4% of the variance in project performance (R-squared = 0.124). The unstandardized coefficient (B = 0.468) indicates that higher reported risk-identification practice predicts higher reported performance. The findings support institutionalizing early and recurring risk registers, cross-functional stakeholder workshops, lessons-learned reviews, and periodic risk updates linked to project decisions. However, the modest explanatory power shows that risk identification is only one component of a wider performance system. Because the design is cross-sectional, self-reported, and based on non-probability sampling, the results establish association and prediction rather than causality and should be interpreted within these methodological limits.
- Downloads
-
Download data is not yet available.
- Author Biography
- References
-
Ahmadi, M., Behzadian, K., Ardeshir, A., & Kapelan, Z. (2016). Comprehensive risk management using fuzzy FMEA and MCDA techniques in highway construction projects. Journal of Civil Engineering and Management, 22(4), 467-477. https://doi.org/10.3846/13923730.2015.1068847 DOI: https://doi.org/10.3846/13923730.2015.1068847
Al-Bahar, J. F., & Crandall, K. C. (1990). Systematic risk management approach for construction projects. Journal of Construction Engineering and Management, 116(3), 533-546. https://doi.org/10.1061/(ASCE)0733-9364(1990)116:3(533) DOI: https://doi.org/10.1061/(ASCE)0733-9364(1990)116:3(533)
Ali, M., Norman, S. Z., Ghani, E., & Haron, N. (2018). The influence of risk management on construction project performance: A case study. Journal of Social Sciences Research, Special Issue 5, 936-942. DOI: https://doi.org/10.32861/jssr.spi5.936.942
Ali, N., Ideris, Z., Alferjany, M. A., & Akram, A. (2023). The effect of risk management practices on project performance: A case study of the Libyan construction industry. Journal of Business Review.
Aven, T. (2016). Risk assessment and risk management: Review of recent advances on their foundation. European Journal of Operational Research, 253(1), 1-13. https://doi.org/10.1016/j.ejor.2015.12.023 DOI: https://doi.org/10.1016/j.ejor.2015.12.023
Batson, R. (2009). Project risk identification methods for construction planning and execution. In Construction Research Congress 2009 (pp. 76-84). American Society of Civil Engineers. https://doi.org/10.1061/41020(339)76 DOI: https://doi.org/10.1061/41020(339)76
Chileshe, N., & Kikwasi, G. J. (2014). Critical success factors for implementation of risk assessment and management practices within the Tanzanian construction industry. Engineering, Construction and Architectural Management. DOI: https://doi.org/10.1108/ECAM-01-2013-0001
Dziadosz, A., & Rejment, M. (2015). Risk analysis in construction project-chosen methods. Procedia Engineering, 122, 258-265. DOI: https://doi.org/10.1016/j.proeng.2015.10.034
Elhoush, R., & Kulatunga, U. (2017). The effectiveness of project risk management: A study within the Libyan oil and gas industry.
Eybpoosh, M., Dikmen, I., & Birgonul, M. T. (2011). Identification of risk paths in international construction projects using structural equation modeling. Journal of Construction Engineering and Management, 137(12), 1164-1175. DOI: https://doi.org/10.1061/(ASCE)CO.1943-7862.0000382
Hillson, D. (2017). Managing risk in projects (2nd ed.). Routledge.
Hillson, D. (2020). Practical project risk management: The ATOM methodology. Management Concepts.
Hughes, M., Tippett, D. D., & Thomas, W. K. (2004). Measuring project success in the construction industry. Engineering Management Journal, 16(3), 36-43. DOI: https://doi.org/10.1080/10429247.2004.11415255
Idris, M. H., Adnan, H., Baharuddin, H. E. A., Zaki, Z. A. M., & Ismail, W. N. W. (2022). Risk factors on civil engineering projects. IOP Conference Series: Earth and Environmental Science, 1067(1), 012064. DOI: https://doi.org/10.1088/1755-1315/1067/1/012064
Kumar, A., & Sood, H. (2023). A study of risk management approaches in construction projects in Bihar. International Journal for Research in Applied Science & Engineering Technology, 11(7), 15-22. https://doi.org/10.22214/ijraset.2023.54304 DOI: https://doi.org/10.22214/ijraset.2023.54304
Odimabo, O., Oduoza, C., & Suresh, S. (2018). An insight into the process, tools, and techniques for construction risk management. IntechOpen. DOI: https://doi.org/10.5772/intechopen.79459
Salleh, F., Palaniappan, S., Theng, I. L. P., Helmi, H. N. M., & Kassim, N. M. (2018). A review on risk management implementation in the construction industry. International Journal of Engineering and Advanced Technology.
Saminu, S., Prasad, R., & Thamilarasu, V. (2015). A study of various factors affecting risk management techniques in construction projects: A case study of India. International Journal of Research in Engineering and Technology, 4(3), 519-523. https://doi.org/10.15623/IJRET.2015.0403098 DOI: https://doi.org/10.15623/ijret.2015.0403098
Sanda, Y. N., Anigbogu, N., Izam, Y. D., & Datukun, H. L. (2021). Developing questionnaire for postgraduate studies in construction management. Journal of Surveying, Construction & Property, 12(1), 19-30. https://doi.org/10.22452/jscp.vol12no1.2 DOI: https://doi.org/10.22452/jscp.vol12no1.2
Tadayon, M., Jaafar, M., & Nasri, E. (2012). An assessment of risk identification in large construction projects in Iran. Journal of Construction Management, 14(1), 34-43.
- Downloads
- Published
- 2026-08-21
- Issue
- Vol. 7 No. 1 (2026)
- Section
- Original Articles
- License
-

This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.
How to Cite
Similar Articles
- Zynab Faraj Elwafe , Masoud Abdelhamid Lajher , Ehab Mohammed Boudraa , Mohammed Jumaa Saleh , Comparative Study of Radiology Department in Derna City Before and After COVID-19 and Daniel Disasters , Derna Academy Journal for Applied Sciences: Vol. 4 No. 1 (2025)
- Osama Rahil Shaltami, Hamza Al Matoni, Mustafa A. Ben Hkoma, Blue Geochemistry: Sustainable Development in Libya Based on Blue Carbon , Derna Academy Journal for Applied Sciences: Vol. 4 No. 2 (2025)
- Osamah Miftah Ahmed, Miftah Larbid, Alkadafe Agelah, Prevalence and Antimicrobial Resistance Patterns of Uropathogenic Bacteria Isolated at Tobruk Medical Center, Tobruk, Libya: A 4-Year Retrospective Study , Derna Academy Journal for Applied Sciences: Vol. 7 No. 1 (2026)
- Fatma A. Elgnashi , Mohammed T. Noor Eldeen , The quality of academic performance as students realize and its relationship to academic achievement in the partial exam of the Biology Division in some scientific courses , Derna Academy Journal for Applied Sciences: Vol. 1 No. 2 (2023)
- Waled Astiata, Jamila Ali Khalifa Ahmed, Raha Saad Abdullah Youssef, Prevalence of Work-Related Musculoskeletal Disorders Among Physiotherapists at the Janzour Center for Disability. , Derna Academy Journal for Applied Sciences: Vol. 4 No. 2 (2025)
- Taweda Abdelraouf Akrim, Maternal Knowledge of Prenatal Screening and Down Syndrome among Pregnant Women in Eastern Libya: A Multicentre Cross-Sectional Study University , Derna Academy Journal for Applied Sciences: Vol. 7 No. 1 (2026)
- Khadeejah Miftah Ali Al-Khurm, Rihab Othman Abdulrraziq , Mohammed Mansour Saeid, ( Withdrawn ) Prevalence of Vitamin D Deficiency Among School Children in Tobruk City, Libya , Derna Academy Journal for Applied Sciences: Vol. 4 No. 1 (2025)
- Tawfg Omar Abdlmola, Ali Guma Azbida, Ahmed Saad, Nour Al-Huda Fawzi, Alaa Hassan, Sara Saad, Aya Masoud, A Comparative Study Between Zinc Level and the Number of Neutrophils and Lymphocytes. , Derna Academy Journal for Applied Sciences: Vol. 3 No. 1 (2025)
- Nesreen Hossen, Yasmin Younas Sulayman , Khadeejah M.A. AL-Khurum, Prevalence of Thyroid Dysfunction in Children and Adolescents in Tobruk City, Libya , Derna Academy Journal for Applied Sciences: Vol. 5 No. 1 (2025)
- Aziza.M. AGWAIDA.ALSHEEKH , Salwa Muftah Eljamay, Embrika. M.Algadar, The Relationship between Vitamin D Deficiency and Anemia and it's Risk in Females , Derna Academy Journal for Applied Sciences: Vol. 2 No. 2 (2024)
You may also start an advanced similarity search for this article.



